BOEING (10) STORY OFFICE
Abatement & Demolition
14900 BOLSA CHICA
HUNTINGTON BEACH, CA
PERFORMANCE PERIOD:
SEPT 2018 – OCT 2019
CONTRACT VALUE: $2,300,000
C L I E N T
Sares Regis
Project Scope:
AMPCO was hired as subcontractor to demolish Boeing’s iconic (10) story office building visible on their PCH, Huntington Beach Boeing Campus. AMPCO performed all hazardous material abatement and interior demolition within the structures to prepare for the structural demolition. AMPCO provided dust barriers, walkway canopies, vibrations monitoring and SWPPP.
AMPCO worked directly with Sares Regis and their project
consultants to assist and overcome Boeing specific requirements. This building had to come bown while not disturbing
the surrounding Boeing buildings and office sites. Sound
and vibration control was also maintained to ensure Beoings
production was not effected
Means and Methods:
AMPCO self performed all necessary environmental and structural demolition utilizing our high reach excavator and support equipment to safely demolish the structure. AMPCO also installed water turbines that were used to suppress the dust during the demolition activities
Challenges Faced:
Throughout the project, AMPCO was able to maintain low vibration and sound requirements necessary to not disturb the scientific laboratories in adjacent buildings, which were operating at 100%.