KRAFT COFFEE PLANT

Abatement & Demolition

100 HALCYON DRIVE , SAN LEANDRO, CA 94578

PERFORMANCE PERIOD:

March 2017 – October 2017

CONTRACT VALUE:  $3,500,000

C L I E N T

Trammell Crow Company

R E F E R E N C E

Dave Drake 949.400.6065

Project Scope:

The former (8) story Kraft Coffee Plant consisted of 427,000 square feet of buildings and structures located on a 34.5-acre site. AMPCO was contracted to complete the abatement and demolition of the structures and site improvements throughout the facility. The environmental scope included universal and regulated waste collection and disposal, asbestos abatement, lead paint removal from the site structures and the cleaning and removal of two 12,000-gallon UST’s. Asbestos containing materials included floor tile and mastic, TSI, asbestos cement piping, galbestos siding, drywall, window putty, caulking, and roof mastic.

The site demolition consisted of the complete demolition of nine connected structures, transformers, and silos totaling 427,000 square feet and 800,000 square feet of site asphalt and concrete. All building slabs, footings, and underground utilities were removed. All concrete and asphalt was crushed on site totaling 65,000 tons.

Challenges Faced:

Buildings were removed using various sized hydraulic excavators weighing between 75,000 to 100,000 lbs. each. A specialized pulverizer was used to process the concrete and remove the rebar. Site concrete and asphalt was removed with 973 track loaders and transported to the on-site crushing area using two 40-ton rock trucks. Material was crushed on site using the 4242 Pegson impact crusher and the 4300 Jaw crusher. Material was crushed to 1” minus and reused on site as fill.