LE CONTE
APARTMENTS

Demolition & Abatement

10995 LECONTE APARTMENTS

LOS ANGELES, CA 90025

PERFORMANCE PERIOD:

SEPT 2019 – DEC 2019

CONTRACT VALUE:  $2,800,000

C L I E N T

PCL

R E F E R E N C E

Wes McGuire 650.608.1332

Project Scope:

4 Story building with a basement consisted of 120,000 square feet in downtown San Francisco. AMPCO was contracted to complete the abatement, demolition and excavation of the building. The environmental scope included asbestos and lead abatement.

Means and Methods:

We started with the abatement beginning at the roof and working our way down, and then followed with abating the PCB’s, lead paint, and created a scrim.

Challenges Faced:

The 4-story Van Ness building was next to an active Assisted Learning Building. AMPCO provided an engineered structural demolition and a site-specific dust control plan then used a multiple 300 series Excavators to demolish the building safely, with no safety incidents or accidents or public property damage.